Planning


What early contractor involvement means

Bringing your builder in before the design is fixed saves time and money. Here is how it works.

Planning

Bring the builder in early

Early contractor involvement means your builder joins the team while the design is still changing. We price options as they come up, so the design stays inside the budget.

Why it saves money

Most cost is fixed in the first sketches. A builder who sees those sketches can suggest a cheaper frame, a simpler roof or a faster way to build before anything is drawn in detail.

What it costs you

A small fee for the early work, which is usually taken off the build price if we go on to build the project.

Questions?

Ask us about your project

Prefer to talk? Call our Auckland office, or come and see us on site. We are happy to walk you through a project like yours.

Send us a few lines about the site, the building and your timing. A project manager will call you within two working days.

Your privacy: We use your details only to answer your message.