Announcement

Open site day, Saturday 14 November: book a free place Book a place

Inside a large distribution centre with racking and yellow crates

Design and build


Kowhai distribution centre

A 14,000 square metre distribution centre with chilled rooms, built in eleven months.

The project

At a glance

  • 14,000 m² Floor area

    Warehouse, chilled rooms and offices

  • 11 months Build time

    From earthworks to handover

  • 24 Loading docks

    With dock levellers and canopies