The site sat between a busy road and the harbour, with room for one crane and no space to store materials. We delivered steel and glass just in time, at night, and kept the footpath open for the whole build.
The owner wanted tenants in before the summer. We split the building into two handovers, so the lower floors opened while the top floors were still being finished.